Integration Bridge list - All the buttons
At the initiation of the Integration Bridge process, the primary objective is to activate the integration bridge, fostering a connection between the predetermined data source and the designated data target.
Upon the successful configuration of the integration bridge, a set of eight distinct buttons emerges, each designed to fulfill specific functionalities. These buttons are outlined as follows:
- Status Indicator Button (Circle Icon):
Indicates the status of the integration bridge.
Red: Indicates the pipeline is not running.
Green: Denotes that the pipeline is in running mode.
The circular icon on the left changes from red to green when the integration process commences. - Integration Initiation Button (Triangular to Square Icon):
Allows the user to initiate the integration bridge.
Clicking on the triangular icon transforms it into a square icon, signifying the initiation of the integration
process. - Refresh Button:
Facilitates the refresh of the service.
Recommended after making any changes to the integration bridge, such as IB name, data operations,
source, target, type, or date. - Service Status Button:
Indicates whether the service is in start or stop mode. - Edit Button:
Empowers users to edit various aspects of the integration bridge, including IB name, data operations,
source, target, type, or date. - View More Button:
Allows users to view comprehensive information about the integration bridge without the ability to make
edits. - Log Download Button:
Facilitates the download of logs for analysis.
Provides data processing details, timestamps, operation status, errors, and warnings. - Log Analysis Button: