Skip to main content

Integration Bridge list - All the buttons

At the initiation of the Integration Bridge process, the primary objective is to activate the integration bridge, fostering a connection between the predetermined data source and the designated data target.
Upon the successful configuration of the integration bridge, a set of eight distinct buttons emerges, each designed to fulfill specific functionalities. These buttons are outlined as follows:
Screenshot (60).png

  •  Status Indicator Button (Circle Icon): green-circle.pnggreen-circle.png  2wCcircle.png